Energy
2 GW HVDC Transmission Line
RoleConstruction Lead- Coordination and technical oversight of detailed execution planning
- Structured preparation and management of construction site readiness
- Civil works delivery coordination during construction phase
- Project close-out documentation and structured handover preparation
Rail
Nationwide Rail Freight Corridor Expansion
RoleSub-Project Lead Infrastructure- Technical lead for early-stage planning of 30 freight passing loops
- Development of approval-ready design packages for nationwide capacity expansion
- Coordination of interdisciplinary rail infrastructure planning interfaces
- Stakeholder alignment within a federally regulated transport program

Real estate
Villa Frequency
RoleOwner's Representation- Developer coordination
- Planning reviews
- Architect meetings
- Quality control

Real estate
Villa Dubai — IXORA
RoleTechnical Advisory — owner's side- Technical point of contact for the owner family
- Status, delays and changes read from the owner’s side
- Snagging — defect and quality process before handover
- Open questions answered before sign-off
Independent project consulting · Civil engineering · International
The contractor sends a €380,000 change order.
You have 48 hours to decide.
That's when you call NÉRA Consulting. Independent technical oversight for infrastructure and real estate projects — wherever the decisions are made.

48:00:00 remaining
Key numbers
€500M+
Project volume delivered
48h
First technical assessment
15+
Years in complex project delivery
The Process
What happens when you reach out.
Day 0
First Call
Free
30 minutes. You describe the situation. I ask the questions that matter. No pitch, no slides — just a direct technical conversation.
48 h
Technical Assessment
Within 48 hours
Based on your documents and inputs. I identify the real risk, the gaps and what needs to happen first. Delivered in writing.
5 days
Engagement or Advice
Within 5 working days · Flexible
Ongoing project representation, a one-time audit or targeted support for a specific issue. You decide the scope and format.
What I do
Three ways to work together.
- 01Most requested
GAP Analysis & Audit
Structured assessment of project processes, responsibilities and delivery systems. Clear recommendations for what needs to change.
- Process and structure analysis
- Hidden risk and inefficiency identification
- Actionable improvement roadmap
- 02
Project Ownership & Representation
Your technical eyes on the project — aligned with your interests, not the contractor's. From planning through to handover.
- Continuous technical monitoring
- Stakeholder interface management
- Early warning and escalation
- 03
Project Review & Technical Assessment
Something in the contract or plans doesn't add up. I review it, find the gaps and tell you exactly where you stand — before you sign.
- Contract and document review
- Independent technical position
- Written finding with clear recommendation

Why NÉRA
Not an agency. A senior engineer — directly.
Most project problems are not caught by large consulting firms with structured processes. They are caught by an experienced engineer who knows what to look for — and is not afraid to say it.
When you brief NÉRA, the engineer picks up the phone. Not an account manager.
- No agency overheadyou work directly with the engineer
- Available within 48 hours of first contact
- Active internationallywherever the project is
- Independentno conflict of interest with contractors
Who it is for
Who NÉRA works for.
You are committing capital to a project managed by others. NÉRA gives you an independent technical view — not reliant on the developer's own report.
When things go wrong, you need someone who comes in fast and gives you a defensible position. That's what NÉRA does.
When internal teams are too close to the problem, an external review surfaces what no one on the inside will say out loud.
Projects
Selected projects.

About NÉRA
Andreas Postler
NÉRA Consulting was founded with one clear intention: to bring structure, clarity and delivery strength into complex projects.
As a civil engineer with experience across large-scale developments and multiple delivery phases, I have supported and led construction-intensive projects from early structuring through to execution. Working within technically demanding environments has shaped a clear belief: complex projects do not fail because of engineering. They fail because of missing alignment, unclear interfaces and unmanaged risk.
We support future energy programs by structuring complexity, aligning stakeholders and strengthening construction delivery. The objective is simple: predictable outcomes in critical infrastructure projects.
Shaping future projects. Delivering with control.
Contact
First conversation is free.

- Phone
- +49 172 159 0258
- Location
- Bavaria, Germany